A Smart Energy hybrid unit powered Murphy’s welfare setup for 50 days, from 25 August to 13 October 2026.
Measured against a diesel generator running around the clock, it cut fuel burned by 81%. The unit used 1,382 litres, against an estimated 7,200 litres for diesel alone.
The back-up generator ran for an average of 4.6 hours a day, and there were 3 days when the site ran fully on solar with zero diesel burned.
Savings are measured against an estimated baseline: a 60kVA diesel generator at 50% load, running 24 hours a day at 6 litres per hour. Diesel is priced at £1.45 per litre and emissions at 3.17 kg CO₂e per litre. The tree equivalent assumes 21 kg CO₂e absorbed per tree per year.