Volker cuts diesel use by 88% at Berrylands Station

The Study

A solar hybrid unit powered Volker’s welfare setup at Berrylands Station for 150 days, from 5 May to 1 October 2026.

Measured against a diesel generator running around the clock, it cut fuel burned by 88%. The unit used 2,485 litres, against an estimated 21,600 litres for diesel alone.

The back-up generator ran for an average of 2.8 hours a day, and there were 7 days when the site ran fully on solar with zero diesel burned.

Client
Volker
Location
Kingston upon Thames
Period on site
5 May 2026 – 1 October 2026
Duration
150 days
Unit used
Smart Energy Hybrid Solar Unit

The Results

Fuel saved19,115litres
Cost saved£34,406excl. VAT
Carbon saved60,594kg CO₂e
Less fuel burned88%
Average daily generator runtime (vs 24 hrs diesel)2.8hrs
Fully solar powered, zero diesel burned7days
Fuel used (vs 21,600 litres that was estimated)2,485litres
Planted for a year, equivalent carbon saving2,885trees

Savings are measured against an estimated baseline: a 60kVA diesel generator at 50% load, running 24 hours a day at 6 litres per hour. Diesel is priced at £1.80 per litre and emissions at 3.17 kg CO₂e per litre. The tree equivalent assumes 21 kg CO₂e absorbed per tree per year.

Can’t find what you are looking for?

Cant find what you're looking for?

Make an enquiry with our sales team and we will call you back.

    How we handle your data

    Email Us

    info@reactivehire.co.uk

    Call Us

    0845 450 3203

    Address

    The Leys Yard, Loughborough Road,
    Hathern, Leics, LE12 5JB

    Request a call back

      How we handle your data